Find help with concrete cancer repairs for Melbourne properties.

Concrete cancer repairs in St Kilda

Concrete cancer repairs for St Kilda flats and apartment blocks: bayside chloride exposure, City of Port Phillip permits and owners corporation approval.

St Kilda is a suburb of flats. At the 2021 Census, 79.0 per cent of occupied dwellings were flats or apartments and 60.4 per cent were rented, according to the ABS QuickStats for St Kilda. With many of those blocks on or near Port Phillip Bay, concrete cancer in balconies, slab edges and car park slabs is a common owners corporation problem here.

Why St Kilda buildings are prone to concrete cancer

The City of Port Phillip’s community profile notes that settlement began around St Kilda, Port Melbourne and South Melbourne in the 1840s, and that rapid growth in the 1960s was aided by the construction of many flats and apartments. Since the early 2000s St Kilda has again been one of the municipality’s main growth areas. So a single St Kilda street can hold 1960s blocks with thin concrete cover alongside recent apartment buildings.

Location adds to age. Cement Concrete & Aggregates Australia’s chloride resistance report explains that coastal structures can receive considerable chloride from the air, and that chlorides reaching the steel break down the protection concrete gives it. Faces that take salt air and driving rain are the ones to inspect first.

Typical jobs in St Kilda

  • Balcony edges and soffits spalling on blocks of flats, often with rusting balustrade fixings. See balcony slab and edge repairs.
  • Concrete stairs, landings and walkway slabs on open-access blocks.
  • Under-croft and basement car park slabs with spalling around drains and joints, handled as concrete spalling repair.
  • Facade slab edges on mid-rise apartment buildings near the foreshore, needing scaffold or swing stage access.
  • Condition surveys before a maintenance plan update, using carbonation and chloride testing.

Council permits in Port Phillip

St Kilda is in the City of Port Phillip, which has its own construction permits:

Permit When it applies
Asset Protection permit Required by a builder carrying out building or demolition works, once council is notified by the building surveyor; a bond is held against damage to council assets
Street occupation permit Any use of a road or lane for construction, including scaffolding, hoardings, mobile cranes or stored materials
Skip bin, out of hours and work zone permits Depending on how the job is run

Port Phillip’s street occupation permit page says applications are assessed within five business days if no more information is needed, and that works must not begin without an approved permit. The application needs a traffic management plan and a public liability certificate of currency. A provider should allow for this in the start date.

Heritage overlays

Port Phillip has many heritage overlay areas and has run a series of amendments to review and extend them. Under the Heritage Overlay, repairs that change the appearance of a heritage place, or that are not done to the same details, specifications and materials, need a planning permit, as does painting a surface that was never painted. Look up the address on VicPlan before choosing a coating for bare concrete.

Owners corporations and access

A typical St Kilda block has an owners corporation that must repair and maintain the common property. Whether a balcony slab is common property depends on the plan of subdivision. Consumer Affairs Victoria says an owners corporation must give the occupier at least 7 days’ written notice before entering a lot for repairs, unless it is an emergency, so balcony programs in a mostly rented building need good tenant communication.

Where scaffold cannot fit inside the property line, it goes on the footpath or lane under the street occupation permit above. Expect providers to ask about rear lane access and parking for a work vehicle.

What it may cost

The Quote Yard’s Victorian concrete repair guide gives a sample range of $1,500 to $2,900 for a 5 square metre concrete cancer repair in bayside Melbourne, before engineering and scaffold. Larger programs are priced per square metre of repair; the concrete cancer cost guide shows the ranges.

Next step for a St Kilda building

Collect photos with unit numbers, the plan of subdivision and any past reports, then send the St Kilda job details. Enquiries are passed to independent businesses that assess the building and quote on their own terms. Nearby, see the Elwood page for the suburb immediately to the south.

Send a job enquiry

Frequently asked questions

Which council covers St Kilda?

St Kilda is in the City of Port Phillip. Council construction permits, such as the Asset Protection permit and street occupation permit, are issued by Port Phillip.

Why do St Kilda buildings get concrete cancer?

Port Phillip's community profile records rapid growth across the municipality in the 1960s, aided by the construction of many flats and apartments, and St Kilda sits on the bay, where salt in the air can reach reinforcement through cracked or thin concrete cover.

How long does a Port Phillip street occupation permit take?

Council says applications are assessed within five business days when no more information is required. Work that uses the road or lane must not start until the permit is approved.

Can repairs on a St Kilda heritage building use different materials?

Inside a Heritage Overlay, repairs not done to the same details, specifications and materials as the original need a planning permit. Ask the provider to match the original or to allow time for a permit.