Find help with concrete cancer repairs for Melbourne properties.

Concrete cancer repairs in Melbourne

Concrete cancer and spalling repairs for Melbourne CBD apartment towers, offices and car parks: City of Melbourne permits, owners corporations and next steps.

The Melbourne CBD, postcode 3000, is almost entirely apartments, offices and commercial buildings, so concrete cancer here is a strata and building management problem more than a householder one. Repairs usually involve an owners corporation or a commercial owner, work at height, and a City of Melbourne permit before any scaffold goes on the footpath.

The building stock in 3000

At the 2021 Census, 99.2 per cent of occupied private dwellings in the suburb of Melbourne were flats or apartments and 71.0 per cent were rented, according to the ABS QuickStats for Melbourne. The City of Melbourne’s community profile records that the municipality’s population halved between the early 1950s and the late 1980s as offices and industry took over, then the number of dwellings almost doubled in the 1990s as former industrial areas were turned into housing.

That history leaves a mix of concrete ages in the same few blocks:

  • Mid-century office buildings, some since converted to apartments.
  • Residential towers from the 1990s onward.
  • Multi-level car parks, loading docks and podium decks that take vehicle traffic, water and grime.
  • Older commercial buildings with concrete awnings and slab edges over the footpath.

Typical concrete cancer jobs in the CBD

Element Common problem Relevant service
Car park slabs and ramps Spalling at joints and drainage points Concrete spalling repair
Slab edges and spandrels on facades Rust staining, cracks along the floor line Facade concrete remediation
Apartment balconies Edge spalling, soffit stains, rusting balustrade fixings Balcony slab and edge repairs
Podium and roof decks Water through failed membranes into the slab Repairs plus protective coatings and sealing

Permits for work over a city footpath

The City of Melbourne says you must get a temporary protective structure permit for hoardings, gantries and scaffolds on a public road or footpath. A hoarding wholly on private property does not need one. If the structure will project over the street alignment, a report and consent must be obtained before the permit application. The application needs, among other things, a dimensioned plan, a traffic management plan, a public liability insurance certificate, a deed of indemnity and a certificate of compliance from a structural engineer.

Council’s report and consent page explains that protection of the public during works is one of the matters a report and consent may cover. A provider who has worked in the CBD will build these lead times into the program. Separate permits can also be needed to park or unload on the road.

Who acts on unsafe concrete in the city

Under the Building Act 1993, a municipal building surveyor can make an emergency order where a building is a danger to life or property, and building notices and orders can require an owner to fix a dangerous condition. The City of Melbourne says building notices are issued to the owners of a property, not to the builder or other contractors, and that an owner who does not respond to a notice in time will be given a building order. Council has a page on responding to a building notice or order. If falling concrete has already been reported, a quick repair or make-safe and an engineer’s report become the first priority.

Owners corporations and landlords

Most CBD towers have an owners corporation, and many are large. Consumer Affairs Victoria classes an owners corporation with more than 100 occupiable lots as tier one and 51 to 100 lots as tier two, and both tiers must have a maintenance plan and maintenance fund. Concrete repairs and coating renewal belong in that plan.

With most CBD dwellings rented, landlords and property managers are often the first to hear about damage. Consumer Affairs Victoria’s renting guidance lists any fault or damage that makes a property unsafe or insecure as an urgent repair. Where the damaged concrete is common property, the landlord’s job is to report it promptly to the owners corporation in writing.

Enquiries from across greater Melbourne

This site takes enquiries from anywhere in metropolitan Melbourne, not only postcode 3000. Neighbouring pages cover St Kilda, Elwood, South Yarra and Port Melbourne, where council profiles record heavy flat building in the 1960s and, in Stonnington, the 1970s. For budgeting, see the Melbourne concrete cancer cost guide; The Quote Yard’s sample price for a 5 square metre concrete cancer repair in inner Melbourne is $1,400 to $2,800, before access and engineering.

Before you enquire

  • Building address, number of levels and whether it has an owners corporation.
  • Photos of each damaged area with a note of the level and elevation.
  • Any engineer’s reports, building notices or previous repair records.
  • Who can approve the work: committee, manager, building owner or tenant representative.

When that is ready, describe the CBD job on the quote form. The site forwards each enquiry to independent providers who make their own assessment and quote; the about page sets out who is responsible for what.

Send a job enquiry

Frequently asked questions

Do I need a council permit for scaffolding in the Melbourne CBD?

For scaffold, hoardings or gantries on a public road or footpath, the City of Melbourne requires a temporary protective structure permit. A structure entirely on private property does not need that permit. Projections over the street alignment need a report and consent first.

Does this site cover areas outside postcode 3000?

Yes. Enquiries are accepted from across metropolitan Melbourne, including the inner suburbs and the bayside. Whether an independent provider takes on a particular job depends on that provider.

What if council has issued a building notice for our building?

Read the notice carefully for the time allowed to respond. A building notice gives the owner a chance to make representations before an order is made. An engineer's report and a repair plan from a registered provider are usually the evidence the building surveyor will want.

Who handles concrete repairs in a rented CBD apartment?

A renter should report the damage to the landlord or agent. If the damaged concrete is common property, the landlord or agent passes it on to the owners corporation manager, who arranges the repair through the owners corporation.